BEC RFP – POSTING: Draft RFP Documents

On March 11, 2019, the Procurement Administrator posted the following documents to the Draft Documents page of the Spring Block Energy and Capacity section of the procurement website under the heading “Spring 2019 Block Energy and Capacity RFP Documents”:

  • Spring 2019 RFP Rules (DRAFT) (March 11, 2019)
  • Appendix 10: Standard Pre-Bid Letter of Credit for AIC Energy Products (FINAL) (March 11, 2019)
  • Appendix 11: Standard Pre-Bid Letter of Credit for ComEd (FINAL) (March 11, 2019)
  • Appendix 12: Standard Pre-Bid Letter of Credit for MEC (FINAL) (March 11, 2019)
  • Appendix 13: Standard Pre-Bid Letter of Credit for AIC Capacity Products (FINAL) (March 11, 2019)

While the Standard Pre-Bid Letter of Credit for each Company is in final form, the RFP Rules posted by the Procurement Administrator are DRAFT ONLY. Final RFP documents will be posted to the Final Materials page of the Spring Block Energy and Capacity section of the procurement website on March 26, 2019.