Announcements


BEC RFP – POSTING: List of Acceptable Modifications to the Post-Bid Letters of Credit for Energy Products

The Procurement Administrator has posted the following documents to the Final Materials page of the Spring Block Energy and Capacity section of the procurement website.

  • Acceptable Modifications to the Post-Bid Standard Form of Letter of Credit (Option 1 and 2) for AIC Energy
  • Acceptable Modifications to the Post-Bid Standard Form of Letter of Credit (Option 1 and 2) for MEC

These modifications are an exhaustive list of modifications acceptable to these Companies as of the Spring 2019 Block Energy and Capacity RFP.  These modifications were proposed during the Part 1 Window and found acceptable by these Companies.