Menu

Skip to content
  • Home
  • Announcements
  • Fall Block Energy and Capacity
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Brownfield
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Low-Income Community Solar Pilot
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Utility-Scale Wind
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Community Renewable Generation Program
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Forms
  • Carbon Mitigation Credits
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Forms
  • Capacity
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Block Energy and Capacity Procurement
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Indexed Wind, Solar, and Brownfield
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Calendar
  • FAQs
  • Useful Links
  • Contact Us
    • Ask a Question
    • Register
    • Qualification Registration Form
  • Previous RFPs

Announcements

  • ANNOUNCEMENT: Request for Stakeholder Feedback on Waiver for Minimum Equity Standard February 8, 2023
  • Indexed REC RFP – REMINDER: Stakeholder Workshop on Wednesday, February 15, 2023 at 1PM (CPT) February 8, 2023
  • Capacity RFP – REMINDER: Bid Submission Training TOMORROW, February 9 February 8, 2023


Final Materials

FINAL Fall 2021 Carbon Mitigation Credits Contract Documents

  • Final CMC Contract (November 15, 2021)
    • Guaranty
    • (ComEd) Form of Guaranty (November 15, 2021)
      • (ComEd) Foreign Guarantor Requirement (November 15, 2021)
    • Post-Bid Letter of Credit
    • Post-Bid Letter of Credit – Option 1 (November 15, 2021)
    • Post-Bid Letter of Credit – Option 2 (November 15, 2021)
      • Letter of Full Transfer – Schedule 1 (November 15, 2021)
      • Letter of Full Transfer – Schedule 2 (November 15, 2021)
      • Letter of Full Transfer – Schedule 3 (November 15, 2021)

Redline Comparisons

  • Redline (draft vs. final) CMC Contract (November 15, 2021)

FINAL Fall 2021 Carbon Mitigation Credits RFP Documents

  • Carbon Mitigation Credit RFP Rules (November 11, 2021)
  • Appendix 2: Proposal Form (November 11, 2021)
    • Proposal Form Attachments (November 11, 2021)
  • Appendix 3: Bid Form (November 11, 2021)
  • Appendix 4: Standard Pre-Bid Letter of Credit for ComEd (FINAL) (October 14, 2021)
    • Final Acceptable Modifications to the Standard Pre-Bid LC for ComEd (November 15, 2021)
  • Appendix 5: Confidentiality Statement (October 14, 2021)
  • Home
  • Announcements
  • Calendar
  • FAQs
  • Useful Links
  • Contact Us
  • Previous RFPs
  • Qualification Form

© 2020 Copyright Illinois Power Agency. All rights reserved.