It is not a requirement to have a system located in ComEd’s or Ameren’s Zone to bid in the SPV RFP. In order to be eligible, a project must, among other restrictions, be interconnected with a regulated utility, municipal utility, or rural electric cooperative in Illinois. Please see documents or the webcast posted to the Supplemental PV Procurement Section for more information.
This FAQ has been updated since it was originally posted on 04-24-2015.