Menu

Skip to content
  • Home
  • Announcements
  • Fall Block Energy and Capacity
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Brownfield
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Low-Income Community Solar Pilot
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Utility-Scale Wind
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Community Renewable Generation Program
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Forms
  • Carbon Mitigation Credits
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Forms
  • Capacity
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Block Energy and Capacity Procurement
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Indexed Wind, Solar, and Brownfield
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Calendar
  • FAQs
  • Useful Links
  • Contact Us
    • Ask a Question
    • Register
    • Qualification Registration Form
  • Previous RFPs

Announcements

  • Indexed REC RFP – REMINDER: Stakeholder Feedback on Indexed REC Procurement Structure Due Friday February 3, 2023 January 26, 2023
  • Capacity RFP – REMINDER: Part 1 Proposals due TODAY, January 25 by 12 PM (noon) CPT! January 25, 2023
  • Capacity RFP – REMINDER: Part 1 Proposals due TOMORROW, Wednesday, January 25 by 12 PM (noon) CPT! January 24, 2023


Announcements

February 28, 2017

DG-5: Can a distributed generation system interconnected at the distribution level of a municipal utility or a rural electric cooperative in Illinois eligible to be bid in the DG RFP?

Yes.

Post navigation

← We are an aggregator and we are asking that certain parameters of the upcoming Utility DG RFP be announced by February 28, namely the capacity factors to be used and the actual Supplier Fee. Is that feasible? For the Utility DG RFP, one of the systems that I could include is one where the system will be built on a site owned by someone other than the owner of the system. Is such a system eligible for participation? →
  • Home
  • Announcements
  • Calendar
  • FAQs
  • Useful Links
  • Contact Us
  • Previous RFPs
  • Qualification Form

© 2020 Copyright Illinois Power Agency. All rights reserved.