DG-10: Can co-located systems under 25-kilowatts on the same interconnection agreement be recognized as separate systems for purposes of bidding?

It would be acceptable if separate Bids are offered for two or more systems that are co-located on the same site and that will be associated with separate Revenue Quality Meters and each interconnected into a separate meter associated with separate utility accounts. Each of these could qualify separately for the sub-25 kW category if each were less than 25 kW in nameplate capacity (DC rating). It would also be acceptable if two or more systems were co-located, all behind the utility meter of a single customer, but each being associated with a separate revenue quality meter and each having its own identifier in the applicable tracking system (GATS or MRETs). No special documentation is required in this case beyond those required for systems below 25 kW.