Menu

Skip to content
  • Home
  • Announcements
  • Fall Block Energy and Capacity
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Brownfield
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Low-Income Community Solar Pilot
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Utility-Scale Wind
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Community Renewable Generation Program
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Forms
  • Carbon Mitigation Credits
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Forms
  • Capacity
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Block Energy and Capacity Procurement
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Indexed Wind, Solar, and Brownfield
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Calendar
  • FAQs
  • Useful Links
  • Contact Us
    • Ask a Question
    • Register
    • Qualification Registration Form
  • Previous RFPs

Announcements

  • BEC RFP – ANNOUNCEMENT: Final ZRC Targets Posted March 20, 2023
  • BEC RFP – ANNOUNCEMENT: Estimates of the Supplier Fees March 20, 2023
  • BEC RFP – ANNOUNCEMENT: Part 1 Window is Open! March 20, 2023


Announcements

November 5, 2019

LIP-40: Can the Seller named in the Part 1 Proposal be changed at a later time?

No, the entity named as the Seller in the Part 1 Proposal cannot be changed.

Post navigation

← If a bidder submits a Part 1 Proposal for a project but does not submit a bid for that project, will the bid participation fee be refunded? If bid assurance collateral was submitted for the project, will the bid assurance collateral be returned? In the Second Item of Section 3, a bidder has the option to define the community associated with the Project to be an area smaller and entirely contained within the operating boundaries of the CBO. I selected “No” and was asked additional questions instead of being invited to continue to the next item of the Part 1 Proposal. Can you confirm that we are understanding the requirements correctly? →
  • Home
  • Announcements
  • Calendar
  • FAQs
  • Useful Links
  • Contact Us
  • Previous RFPs
  • Qualification Form

© 2020 Copyright Illinois Power Agency. All rights reserved.