Menu

Skip to content
  • Home
  • Announcements
  • Fall Block Energy and Capacity
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Brownfield
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Low-Income Community Solar Pilot
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Utility-Scale Wind
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Community Renewable Generation Program
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Forms
  • Carbon Mitigation Credits
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Forms
  • Capacity
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Block Energy and Capacity Procurement
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Indexed Wind, Solar, and Brownfield
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Calendar
  • FAQs
  • Useful Links
  • Contact Us
    • Ask a Question
    • Register
    • Qualification Registration Form
  • Previous RFPs

Announcements

  • ANNOUNCEMENT: Request for Stakeholder Feedback on Waiver for Minimum Equity Standard February 8, 2023
  • Indexed REC RFP – REMINDER: Stakeholder Workshop on Wednesday, February 15, 2023 at 1PM (CPT) February 8, 2023
  • Capacity RFP – REMINDER: Bid Submission Training TOMORROW, February 9 February 8, 2023


Announcements

April 8, 2020

Archived-BEC-31: Can we propose an additional modification to the supplier contracts?

The deadline to submit comments on the supplier contracts was March 11, 2020.  Bidders are required, as a condition of participation in the BEC RFP, to accept the terms of the applicable supplier contracts as posted to the procurement website without modification.

Post navigation

← Will the responses to the feedback solicited by the IPA regarding the “Next Wind Procurement” be posted to the IPA website? Can we propose a modification to the conditions for drawing on the Pre-Bid Letter of Credit? We are specifically looking at the provision where a draw could occur if the Bidder disclosed information relating to its Proposal publicly or to any other party before the Illinois Commerce Commission has rendered its decision on the results of the Procurement Event. We realize this is not listed as an acceptable modification, but this could conflict with disclosures we may be required to make to our regulators. →