Menu

Skip to content
  • Home
  • Announcements
  • Block Energy and Capacity Procurement
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Fall Block Energy and Capacity
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Brownfield
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Low-Income Community Solar Pilot
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Utility-Scale Wind
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Community Renewable Generation Program
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Forms
  • Carbon Mitigation Credits
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Forms
  • Indexed Wind, Solar, and Brownfield
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Coal to Solar
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Calendar
  • FAQs
  • Useful Links
  • Contact Us
    • Ask a Question
    • Register
    • Qualification Registration Form
  • Previous RFPs

Announcements

  • Indexed REC RFP – ANNOUNCEMENT: Invitation to Comment on the First Draft Indexed REC Contract and Draft Preliminary Proposal Requirements August 12, 2022
  • BEC RFP – REMINDER: Part 1 Proposals due Tuesday, August 16 by 12 PM (noon) CPT! August 12, 2022
  • C2S Procurement – REMINDER: Register for an Account to Access the Online Proposal Form August 11, 2022


Announcements

November 11, 2021

CMC-4: Can you provide instructions for submission of the Pre-Bid Letter of Credit to ComEd?

The instructions for submission of the Pre-Bid Letter of Credit to ComEd are now available upon request. Please email the Procurement Administrator at Illinois-RFP@nera.com.

Post navigation

← Is a Bidder required to pay the Bid Participation Fee for the Fall 2021 Carbon Mitigation Credits RFP (“CMC RFP”)? In relation to the Carbon Mitigation Credits RFP, we understand that there was a comment process that was held to solicit comments on the CMC Contract. Is there a negotiation process between the utility counterparty and bidders for additional changes to be considered and are we still able to make changes to the CMC Contract posted on November 15, 2021? →
  • Home
  • Announcements
  • Calendar
  • FAQs
  • Useful Links
  • Contact Us
  • Previous RFPs
  • Qualification Form

© 2020 Copyright Illinois Power Agency. All rights reserved.