Menu

Skip to content
  • Home
  • Announcements
  • Fall Block Energy and Capacity
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Brownfield
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Low-Income Community Solar Pilot
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Utility-Scale Wind
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Community Renewable Generation Program
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Forms
  • Carbon Mitigation Credits
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Forms
  • Capacity
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Block Energy and Capacity Procurement
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Indexed Wind, Solar, and Brownfield
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Calendar
  • FAQs
  • Useful Links
  • Contact Us
    • Ask a Question
    • Register
    • Qualification Registration Form
  • Previous RFPs

Announcements

  • Indexed REC RFP – REMINDER: Webcast Scheduled for Tuesday, October 3, 2023 at 3PM (CPT) September 26, 2023
  • BEC RFP – ANNOUNCEMENT: ICC Has Approved the Results of the Fall 2023 AIC Capacity Procurement Event September 21, 2023
  • Indexed REC RFP – REMINDER: Webcast Scheduled for Tuesday, October 3, 2023 at 3PM (CPT) September 19, 2023


Announcements

November 11, 2021

CMC-4: Can you provide instructions for submission of the Pre-Bid Letter of Credit to ComEd?

The instructions for submission of the Pre-Bid Letter of Credit to ComEd are now available upon request. Please email the Procurement Administrator at Illinois-RFP@nera.com.

Post navigation

← Is a Bidder required to pay the Bid Participation Fee for the Fall 2021 Carbon Mitigation Credits RFP (“CMC RFP”)? In relation to the Carbon Mitigation Credits RFP, we understand that there was a comment process that was held to solicit comments on the CMC Contract. Is there a negotiation process between the utility counterparty and bidders for additional changes to be considered and are we still able to make changes to the CMC Contract posted on November 15, 2021? →
  • Home
  • Announcements
  • Calendar
  • FAQs
  • Useful Links
  • Contact Us
  • Previous RFPs
  • Qualification Form

© 2020 Copyright Illinois Power Agency. All rights reserved.