Announcements


DG-134: For purposes of qualifying a system into the DG RFP, can the system be connected to an electric cooperative?

There is a minimum bid size requirement of 1 MW and thus small systems participate in the Utility DG RFP through an aggregator. A distributed generation system must be interconnected at the distribution level of an electric utility, a municipal utility that owns or operates electric distribution facilities, or a rural electric cooperative as defined in the Public Utilities Act.