No. Consistent with the IPA’s Supplemental PV Procurement Plan, the November procurement event features size category procurement targets of 15% of RECs from systems 25 kW to 500 kW in size (the “25-500 Product”), and 35% of RECs for systems 500 kW to 2 MW in size (the “Over-500 Product”). In all procurement events, including the November 2015 procurement event, 50% of RECs must come from systems below 25 kW in size (Sub-25 Product).
This FAQ has been updated since it was originally posted on 05-21-2015.