BEC-1: Have there been changes to the supplier contracts or the Pre-Bid Letters of Credit for the Fall 2019 BEC RFP? If so, when are comments due on those changes?

The supplier contracts for the Fall 2019 BEC RFP are the same as the final supplier contracts from the Spring 2019 BEC RFP (except for the administrative addition of specific dates for the scheduling of October 2019 products in the ComEd contract).  The administrative addition of specific dates is reflected in the “Redline (Spring 2019 vs Fall 2019) Confirmation Sheet – Sample (July 19, 2019)” posted on the Final Materials page of the dedicated Block Energy and Capacity section of the procurement website.

Similarly, the Pre-Bid Letters of Credit are the same as the final documents from the Spring 2019 BEC RFP (except for administrative updates such as the expiration date and date of the procurement event).  As such, there is no comment process on these documents under the Fall 2019 BEC RFP.

Revised 7/25/2019 first posted 7/16/2019