Menu

Skip to content
  • Home
  • Announcements
  • Block Energy and Capacity Procurement
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Fall Block Energy and Capacity
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Brownfield
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Low-Income Community Solar Pilot
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Utility-Scale Wind
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Community Renewable Generation Program
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Forms
  • Carbon Mitigation Credits
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Forms
  • Indexed Wind, Solar, and Brownfield
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Coal to Solar
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Calendar
  • FAQs
  • Useful Links
  • Contact Us
    • Ask a Question
    • Register
    • Qualification Registration Form
  • Previous RFPs

Announcements

  • Indexed REC RFP – ANNOUNCEMENT: Invitation to Comment on the First Draft Indexed REC Contract and Draft Preliminary Proposal Requirements August 12, 2022
  • BEC RFP – REMINDER: Part 1 Proposals due Tuesday, August 16 by 12 PM (noon) CPT! August 12, 2022
  • C2S Procurement – REMINDER: Register for an Account to Access the Online Proposal Form August 11, 2022


Announcements

February 23, 2018

BEC-1: How do I register to receive announcements for the Block Energy and Capacity RFP?

Please register here and select “Block Energy and Capacity RFP”:

https://www.ipa-energyrfp.com/contact-us/register/

or contact the Procurement Administrator via email.

Post navigation

← While the amount of bid assurance collateral required per MW for a solar project is the same as in the 2017 Wind & Solar RFP, we note that the bid assurance collateral limits per utility have increased substantially. Can you please explain the reasons for the change? Can participants in a procurement event release information about their bids and Proposals beyond the information that is released by the Commission at the conclusion of a procurement event? →
  • Home
  • Announcements
  • Calendar
  • FAQs
  • Useful Links
  • Contact Us
  • Previous RFPs
  • Qualification Form

© 2020 Copyright Illinois Power Agency. All rights reserved.