SPV-166: How will the IPA view a group of sub-25 kW systems that sit behind a master meter with regards to submission into the program’s size categories?

One condition for co-located installations to be “distributed generation” is for each installation to be behind the customer meter (please review all conditions for such installations to be distributed generation). For these installations to be considered separate systems that can be bid separately in the procurement events in the Sub-25 Category, each installation or system must have its own separate revenue quality meter and each must have its own identifier in the applicable tracking system (GATS or MRETs).