We cannot provide engineering or installation advice with respect to the distributed generation systems but we can provide additional information regarding the rules of the procurement event.
One condition for co-located installations to be “distributed generation” is for each installation to be behind the customer meter (please review all conditions for such installations to be distributed generation). For these installations to be considered separate systems that can be bid separately in the procurement events, each installation or system must have its own separate revenue quality meter and each must have its own identifier in the applicable tracking system (GATS or MRETs).