SPV-87: I own a small solar system for my home which has an April 2014 Energized Date. Can I qualify for the SPV RFP or the DG RFP?

Under the SPV RFP, the system requirements include that the system must be new, meaning that it must have been energized after January 21, 2015. As such, your home system does not qualify. Under the DG RFP, the minimum bid size is 1 MW. While your system could be part of a larger bid by an aggregator, your system alone does not qualify.