The obligations of the REC Contract are linked to the REC delivery and not to the size of the Project. However, if the project is not a brownfield site photovoltaic project, the RECs delivered under the terms of the REC Contract must be associated with generation from a utility-scale solar project, which is defined in the Act as having a nameplate capacity greater than 2,000 kW (AC rating).