IFP-64: If our Project is selected through the New Solar RFP, can we change the site as long as we maintain our bid price?

No. The RECs bid into the New Solar RFP and purchased through the REC Contract are associated with a specific Project on a site described in the Proposal.  With each REC delivery, the Seller will be required to represent that at least 50% of the Project is located within the physical location identified in the Proposal.