Menu

Skip to content
  • Home
  • Announcements
  • Fall Block Energy and Capacity
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Brownfield
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Low-Income Community Solar Pilot
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Utility-Scale Wind
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Community Renewable Generation Program
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Forms
  • Carbon Mitigation Credits
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Forms
  • Capacity
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Block Energy and Capacity Procurement
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Indexed Wind, Solar, and Brownfield
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Calendar
  • FAQs
  • Useful Links
  • Contact Us
    • Ask a Question
    • Register
    • Qualification Registration Form
  • Previous RFPs

Announcements

  • Capacity RFP – REMINDER: Part 2 Proposals Due Friday, February 10 by 12 PM (noon) CPT! February 6, 2023
  • Indexed REC RFP – FINAL REMINDER: Stakeholder Feedback on Indexed REC Procurement Structure Due Today, February 3 February 3, 2023
  • BEC RFP – ANNOUNCEMENT: Spring 2023 Block Energy and Capacity RFP February 1, 2023


Announcements

July 31, 2017

W&S-135: Is it possible that we will win less than the annual quantity that we bid for our Project?

Please see FAQ-W&S-85. Yes, the evaluation of Bids can result in a Bidder having winning Bids for only a portion of the annual quantity from a Project. Should the Bid be approved by the Commission, such Bidder will have the option to reject the partial award of a portion of the annual quantity for a Project.

Post navigation

← The current RFP is for 200,000 solar RECs and states that multiple procurement events will be held to reach the goal of 1,000,000 RECs. Could you kindly advise on the timing of the next anticipated procurement event for solar RECs? Paragraph I.2.6 of the RFP Rules states that “A Bidder may present Bids for various Projects as long as the aggregate number of RECs from all such Projects on an annual basis does not exceed either the Wind Target or the Solar Target.” Given that the Solar Target equals 200,000 RECs for this solicitation, are we to understand that we can bid a maximum of 200,000 RECs into this solicitation inclusive of all our proposed projects? →