Menu

Skip to content
  • Home
  • Announcements
  • Fall Block Energy and Capacity
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Brownfield
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Low-Income Community Solar Pilot
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Utility-Scale Wind
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Community Renewable Generation Program
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Forms
  • Carbon Mitigation Credits
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Forms
  • Capacity
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Block Energy and Capacity Procurement
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Indexed Wind, Solar, and Brownfield
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Calendar
  • FAQs
  • Useful Links
  • Contact Us
    • Ask a Question
    • Register
    • Qualification Registration Form
  • Previous RFPs

Announcements

  • BEC RFP – ANNOUNCEMENT: Final ZRC Targets Posted March 20, 2023
  • BEC RFP – ANNOUNCEMENT: Estimates of the Supplier Fees March 20, 2023
  • BEC RFP – ANNOUNCEMENT: Part 1 Window is Open! March 20, 2023


Announcements

February 16, 2018

IFP-42: Is the bid assurance collateral returned or is it effectively a fee for participating in the procurement events?

Bid assurance collateral is returned or cancelled at the end of the second procurement events (more precise timing is provided in the RFP Rules).

Post navigation

← We requested multiple accounts for submitting proposals for multiple projects. Does the Procurement Administrator pre-assign Projects to each of the accounts so that we should specifically use a particular account for a given Project? While the amount of bid assurance collateral required per MW for a solar project is the same as in the 2017 Wind & Solar RFP, we note that the bid assurance collateral limits per utility have increased substantially. Can you please explain the reasons for the change? →