Menu

Skip to content
  • Home
  • Announcements
  • Fall Block Energy and Capacity
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Brownfield
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Low-Income Community Solar Pilot
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Utility-Scale Wind
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Community Renewable Generation Program
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Forms
  • Carbon Mitigation Credits
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Forms
  • Capacity
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Block Energy and Capacity Procurement
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Indexed Wind, Solar, and Brownfield
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Calendar
  • FAQs
  • Useful Links
  • Contact Us
    • Ask a Question
    • Register
    • Qualification Registration Form
  • Previous RFPs

Announcements

  • Capacity RFP – REMINDER: Bid Submission Training TOMORROW, February 9 February 8, 2023
  • Capacity RFP – REMINDER: Part 2 Proposals Due Friday, February 10 by 12 PM (noon) CPT! February 6, 2023
  • Indexed REC RFP – FINAL REMINDER: Stakeholder Feedback on Indexed REC Procurement Structure Due Today, February 3 February 3, 2023


Announcements

April 27, 2017

DG-106: Should we contact the IPA or GATS for meter-read verification procedures?

Please contact GATS directly regarding meter-read verification procedures:

gatsadmin@pjm-eis.com

(877) 750-GATS (4287)

Post navigation

← Can we submit the supplier fees at this time or must we wait until there is a decision of the Commission on the results of the procurement event and the IPA sends us an invoice? Are the payments under the applicable supplier contracts based on the RECs actually produced by our solar systems or based on the RECs that would be expected from these systems given their sizes and the capacity factors? If based on actual production, what would happen in an extremely cloudy year? →
  • Home
  • Announcements
  • Calendar
  • FAQs
  • Useful Links
  • Contact Us
  • Previous RFPs
  • Qualification Form

© 2020 Copyright Illinois Power Agency. All rights reserved.