Menu

Skip to content
  • Home
  • Announcements
  • Fall Block Energy and Capacity
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Brownfield
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Low-Income Community Solar Pilot
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Utility-Scale Wind
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Community Renewable Generation Program
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Forms
  • Carbon Mitigation Credits
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Forms
  • Capacity
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Block Energy and Capacity Procurement
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Indexed Wind, Solar, and Brownfield
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Calendar
  • FAQs
  • Useful Links
  • Contact Us
    • Ask a Question
    • Register
    • Qualification Registration Form
  • Previous RFPs

Announcements

  • Capacity RFP – REMINDER: Part 2 Proposals Due Friday, February 10 by 12 PM (noon) CPT! February 6, 2023
  • Indexed REC RFP – FINAL REMINDER: Stakeholder Feedback on Indexed REC Procurement Structure Due Today, February 3 February 3, 2023
  • BEC RFP – ANNOUNCEMENT: Spring 2023 Block Energy and Capacity RFP February 1, 2023


Announcements

August 3, 2017

W&S-162: There are two options for the Post-Bid Letter of Credit attached to the REC Contract. Is a winning bidder allowed to use either of the two forms, for any of the Companies?

Yes.

Post navigation

← Our Project has a large number of executed leases for the site. Can we submit a spreadsheet with information about the Owners? Can we provide one typical lease? If our Project is selected but we don’t execute the REC Contract, do we lose our bid assurance collateral? Are we in default under the terms of the REC Contract? →
  • Home
  • Announcements
  • Calendar
  • FAQs
  • Useful Links
  • Contact Us
  • Previous RFPs
  • Qualification Form

© 2020 Copyright Illinois Power Agency. All rights reserved.