A Seller may request to replace a winning system identified in its SPV Contract prior to the system being energized. Such request must be made in writing to the IPA and is granted at the sole discretion of the IPA. In addition, the substitute system must be within the great of + 25% or + 5 kW (whichever is greater) of the planned installed capacity of the system being replaced and must meet all the requirements for systems to be eligible for the SPV RFP. Please see section 3.10 of the SPV Contract for all requirements for substituting systems under the SPV Contract.