Menu

Skip to content
  • Home
  • Announcements
  • Fall Block Energy and Capacity
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Brownfield
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Low-Income Community Solar Pilot
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Utility-Scale Wind
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Community Renewable Generation Program
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Forms
  • Carbon Mitigation Credits
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Forms
  • Capacity
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Block Energy and Capacity Procurement
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Indexed Wind, Solar, and Brownfield
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Calendar
  • FAQs
  • Useful Links
  • Contact Us
    • Ask a Question
    • Register
    • Qualification Registration Form
  • Previous RFPs

Announcements

  • ANNOUNCEMENT: Request for Stakeholder Feedback on Waiver for Minimum Equity Standard February 8, 2023
  • Indexed REC RFP – REMINDER: Stakeholder Workshop on Wednesday, February 15, 2023 at 1PM (CPT) February 8, 2023
  • Capacity RFP – REMINDER: Bid Submission Training TOMORROW, February 9 February 8, 2023


Announcements

March 31, 2017

BE-22: What are the Supplier Fees for the Spring 2017 procurement event under the Block Energy/Standard Products RFP?

The Supplier Fees are as follows:

$ 92 per off-peak block

$ 138 per on-peak block

Post navigation

← If we are a current supplier to a Company and we have winning bids in the Block Energy/Standard Products RFP again this year, will we be required to execute the 2017 Agreement or will we simply be executing a Confirmation under our existing Agreement? Is it correct that the lowest priced bid must be on the first 1 MW of systems and that after the first 1 MW of systems, we can select any bid size as long as: (i) the bid is at least 100 kW; (ii) the bid price is more than the bid price of the first 1 MW; and (iii) each system is contained fully in one block? →
  • Home
  • Announcements
  • Calendar
  • FAQs
  • Useful Links
  • Contact Us
  • Previous RFPs
  • Qualification Form

© 2020 Copyright Illinois Power Agency. All rights reserved.