A Bidder including an existing system in its Proposal must provide one of the following documents to support the qualification for each existing system:

  1. Interconnection Agreement;
  2. Net metering application approval letter;
  3. Final system inspection confirmation;
  4. GATS/M-RETS system registration application and approval letter;
  5. permission to operate letter; or:
  6. other relevant documentation clearly showing the date at which the system was energized or began operation.