Menu

Skip to content
  • Home
  • Announcements
  • Fall Block Energy and Capacity
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Brownfield
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Low-Income Community Solar Pilot
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Utility-Scale Wind
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Community Renewable Generation Program
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Forms
  • Carbon Mitigation Credits
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Forms
  • Capacity
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Block Energy and Capacity Procurement
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Indexed Wind, Solar, and Brownfield
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Calendar
  • FAQs
  • Useful Links
  • Contact Us
    • Ask a Question
    • Register
    • Qualification Registration Form
  • Previous RFPs

Announcements

  • BEC RFP – ANNOUNCEMENT: Final ZRC Targets Posted March 20, 2023
  • BEC RFP – ANNOUNCEMENT: Estimates of the Supplier Fees March 20, 2023
  • BEC RFP – ANNOUNCEMENT: Part 1 Window is Open! March 20, 2023


Announcements

May 27, 2015

SPV-75: What entity should be provided in Section J, Name of Seller, of the Worksheet Insert (#P1-2) if the Seller is a Company?

In the case that the Seller is a Company, please provide the Company’s name in the first field of Section J, Name of Seller, and then provide information for the Representative in the remaining fields.

Post navigation

← Not all of the systems included in my Part 1 Proposal have specific Energized Dates. With reference to the Worksheet Insert (#P1-2), is it acceptable to indicate an expected Energized Date provided that I clearly explain in the Justification of Omissions is not definite? With reference to Section I, Tracking System, of the Worksheet Insert (#P1-2), if my system is not yet registered with a tracking system, is it acceptable to check the box of the tracking system (PJM-EIS GATS or M-RETS) with which I expect to register my system? →
  • Home
  • Announcements
  • Calendar
  • FAQs
  • Useful Links
  • Contact Us
  • Previous RFPs
  • Qualification Form

© 2020 Copyright Illinois Power Agency. All rights reserved.