Menu

Skip to content
  • Home
  • Announcements
  • Block Energy and Capacity Procurement
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Fall Block Energy and Capacity
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Brownfield
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Low-Income Community Solar Pilot
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Utility-Scale Wind
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Community Renewable Generation Program
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Forms
  • Carbon Mitigation Credits
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Forms
  • Indexed Wind, Solar, and Brownfield
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Coal to Solar
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Calendar
  • FAQs
  • Useful Links
  • Contact Us
    • Ask a Question
    • Register
    • Qualification Registration Form
  • Previous RFPs

Announcements

  • Indexed REC RFP – ANNOUNCEMENT: Invitation to Comment on the First Draft Indexed REC Contract and Draft Preliminary Proposal Requirements August 12, 2022
  • BEC RFP – REMINDER: Part 1 Proposals due Tuesday, August 16 by 12 PM (noon) CPT! August 12, 2022
  • C2S Procurement – REMINDER: Register for an Account to Access the Online Proposal Form August 11, 2022


Announcements

September 25, 2015

STP-81: What is the process if we won additional quantities for a utility and we have an existing guaranty?

Please address all questions regarding the contract execution process to the relevant utility.  Contact information will be provided to winning bidders upon request.

Post navigation

← How does IPA handle situations in which a system location changes during the term of the IPA REC Purchase and Sale Agreement? For example, if a system will require a new service request with the corresponding utility, but the utility issues an address different from what was requested and on the REC agreement (with a new lot number after the land is subdivided). What occurs if a system is awarded a contract, but due to some unforeseen delay the system does not generate 1 REC by May 31st for delivery to the utility by July 15th? Is there an extension process? Is the contract cancelled and the entirety of the letter of credit forfeited? →
  • Home
  • Announcements
  • Calendar
  • FAQs
  • Useful Links
  • Contact Us
  • Previous RFPs
  • Qualification Form

© 2020 Copyright Illinois Power Agency. All rights reserved.