Menu

Skip to content
  • Home
  • Announcements
  • Fall Block Energy and Capacity
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Brownfield
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Low-Income Community Solar Pilot
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Utility-Scale Wind
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Community Renewable Generation Program
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Forms
  • Carbon Mitigation Credits
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Forms
  • Capacity
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Block Energy and Capacity Procurement
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Indexed Wind, Solar, and Brownfield
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Calendar
  • FAQs
  • Useful Links
  • Contact Us
    • Ask a Question
    • Register
    • Qualification Registration Form
  • Previous RFPs

Announcements

  • BEC RFP – ANNOUNCEMENT: Final Block Targets Posted March 31, 2023
  • Indexed REC RFP – ANNOUNCEMENT: Invitation to Comment on the Second Draft Indexed REC Contract and Draft Indexed REC RFP Rules March 30, 2023
  • BEC RFP – REMINDER: Part 1 Proposals due TODAY, March 27 by 12 PM (noon) CPT March 27, 2023


Announcements

December 3, 2019

CPG-27: What is the supplier fee under the Non-Solar Community Renewables RFP?

The exact amount of the supplier fee will be announced no later than two (2) business days before the Bid Date.

Post navigation

← If we specify a minimum capacity in the bid for a Project, are we required to build the Project at that minimum capacity? For example, if we specify a 1.5 MW minimum capacity, can we build a 2 MW Project knowing that we will receive revenue from the sale of RECs associated with only 1.5 MW? What is the supplier fee under the Low-Income Community Solar Pilot RFP? →
  • Home
  • Announcements
  • Calendar
  • FAQs
  • Useful Links
  • Contact Us
  • Previous RFPs
  • Qualification Form

© 2020 Copyright Illinois Power Agency. All rights reserved.