Menu

Skip to content
  • Home
  • Announcements
  • Fall Block Energy and Capacity
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Brownfield
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Low-Income Community Solar Pilot
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Utility-Scale Wind
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Community Renewable Generation Program
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Forms
  • Carbon Mitigation Credits
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Forms
  • Capacity
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Block Energy and Capacity Procurement
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Indexed Wind, Solar, and Brownfield
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Calendar
  • FAQs
  • Useful Links
  • Contact Us
    • Ask a Question
    • Register
    • Qualification Registration Form
  • Previous RFPs

Announcements

  • BEC RFP – ANNOUNCEMENT: Final ZRC Targets Posted March 20, 2023
  • BEC RFP – ANNOUNCEMENT: Estimates of the Supplier Fees March 20, 2023
  • BEC RFP – ANNOUNCEMENT: Part 1 Window is Open! March 20, 2023


Announcements

April 16, 2015

REC-31: What is the turnaround time for review of the letter of credit?

The Procurement Administrator provides to the Bidder a Company’s assessment of a Pre-Bid Letter of Credit as soon as practicable and generally on the day of receipt.

Post navigation

← I missed the training session. Was it recorded? Where can I find information about the bid submission procedure? The deadline to cure our Part 2 Proposal deficiency is tomorrow at 6 PM. It will not be possible for us to deliver hardcopies of our Pre-Bid Letter of Credit, as instructed in our deficiency notice, in time to meet the deadline. Can we provide a scanned copy of our amended Pre-Bid Letter of Credit instead? →
  • Home
  • Announcements
  • Calendar
  • FAQs
  • Useful Links
  • Contact Us
  • Previous RFPs
  • Qualification Form

© 2020 Copyright Illinois Power Agency. All rights reserved.