Menu

Skip to content
  • Home
  • Announcements
  • Fall Block Energy and Capacity
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Brownfield
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Low-Income Community Solar Pilot
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Utility-Scale Wind
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Community Renewable Generation Program
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Forms
  • Carbon Mitigation Credits
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Forms
  • Capacity
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Block Energy and Capacity Procurement
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Indexed Wind, Solar, and Brownfield
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Calendar
  • FAQs
  • Useful Links
  • Contact Us
    • Ask a Question
    • Register
    • Qualification Registration Form
  • Previous RFPs

Announcements

  • BEC RFP – ANNOUNCEMENT: Final ZRC Targets Posted March 20, 2023
  • BEC RFP – ANNOUNCEMENT: Estimates of the Supplier Fees March 20, 2023
  • BEC RFP – ANNOUNCEMENT: Part 1 Window is Open! March 20, 2023


Announcements

August 10, 2017

BE-70: What should we put as the Date of Issuance for the Pre-Bid Letter of Credit?

The Date of Issuance of the Pre-Bid Letter of Credit should be the date on which the bank actually issues your Pre-Bid Letter of Credit.

Post navigation

← If we are a supplier under both the Spring 2017 Block Energy/Standard Products RFP and the Fall 2017 Block Energy and Capacity RFP, are we required to send separate invoices, one for each contract or is an aggregated invoice permissible? Additionally, should we schedule volume from each solicitation separately or is one aggregated schedule preferred? Can I propose modifications to the Standard Pre-Bid Letters of Credit after the Part 1 Date? →
  • Home
  • Announcements
  • Calendar
  • FAQs
  • Useful Links
  • Contact Us
  • Previous RFPs
  • Qualification Form

© 2020 Copyright Illinois Power Agency. All rights reserved.