Menu

Skip to content
  • Home
  • Announcements
  • Fall Block Energy and Capacity
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Brownfield
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Low-Income Community Solar Pilot
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Utility-Scale Wind
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Community Renewable Generation Program
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Forms
  • Carbon Mitigation Credits
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Forms
  • Capacity
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Block Energy and Capacity Procurement
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Indexed Wind, Solar, and Brownfield
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Calendar
  • FAQs
  • Useful Links
  • Contact Us
    • Ask a Question
    • Register
    • Qualification Registration Form
  • Previous RFPs

Announcements

  • Indexed REC RFP – REMINDER: Stakeholder Feedback on Indexed REC Procurement Structure Due Friday February 3, 2023 January 26, 2023
  • Capacity RFP – REMINDER: Part 1 Proposals due TODAY, January 25 by 12 PM (noon) CPT! January 25, 2023
  • Capacity RFP – REMINDER: Part 1 Proposals due TOMORROW, Wednesday, January 25 by 12 PM (noon) CPT! January 24, 2023


Announcements

March 31, 2022

BEC-19: When are the Bid Form(s) for the Fall 2022 BEC RFP provided to Bidders?

The Bid Form(s) for the Fall 2022 BEC RFP will be provided to Bidders with the Part 1 Notification on August 22, 2022.  The Bid Forms, as provided to each Bidder by the Procurement Administrator, are the exclusive method for submitting a Bidder’s Bids.

Post navigation

← If we have a winning Bid for a Project and sign the Indexed REC Contract, can we substitute the Project at a later date if it turns out the interconnection cost is higher than expected? There is a mechanism under the Adjustable Block Program that provides an option to substitute a Project if interconnection costs exceed a certain threshold. If a comparable mechanism is not available, can we withdraw a project after signing the Indexed REC Contract? If we have a Project with an approved Bid, will the cash we posted as bid assurance collateral be returned before we post Performance Assurance under the Indexed REC Contract? →
  • Home
  • Announcements
  • Calendar
  • FAQs
  • Useful Links
  • Contact Us
  • Previous RFPs
  • Qualification Form

© 2020 Copyright Illinois Power Agency. All rights reserved.