Menu

Skip to content
  • Home
  • Announcements
  • Block Energy and Capacity Procurement
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Fall Block Energy and Capacity
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Brownfield
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Low-Income Community Solar Pilot
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Utility-Scale Wind
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Community Renewable Generation Program
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Forms
  • Carbon Mitigation Credits
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Forms
  • Indexed Wind, Solar, and Brownfield
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Coal to Solar
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Calendar
  • FAQs
  • Useful Links
  • Contact Us
    • Ask a Question
    • Register
    • Qualification Registration Form
  • Previous RFPs

Announcements

  • BEC RFP – ANNOUNCEMENT: Fall 2022 Block Energy and Capacity RFP June 21, 2022
  • Supplemental RFP – ANNOUNCEMENT: ICC Has Approved the Results of the Supplemental Procurement Events for Block Energy May 20, 2022
  • Supplemental RFP – REMINDER: Bids Due Monday, May 16! May 13, 2022


Announcements

March 31, 2017

DG-61: When we identify our systems using the Worksheet Insert, what do you mean by the customer account number?

In this cell of the Worksheet Insert, please enter the customer’s account number with the electric distribution utility.

Post navigation

← Is it correct that the lowest priced bid must be on the first 1 MW of systems and that after the first 1 MW of systems, we can select any bid size as long as: (i) the bid is at least 100 kW; (ii) the bid price is more than the bid price of the first 1 MW; and (iii) each system is contained fully in one block? You mentioned that there are items that are requirements of the Part 1 Proposal but for which a bidder can have additional time. How much more time can we have? →
  • Home
  • Announcements
  • Calendar
  • FAQs
  • Useful Links
  • Contact Us
  • Previous RFPs
  • Qualification Form

© 2020 Copyright Illinois Power Agency. All rights reserved.