Menu

Skip to content
  • Home
  • Announcements
  • Fall Block Energy and Capacity
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Brownfield
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Low-Income Community Solar Pilot
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Utility-Scale Wind
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Community Renewable Generation Program
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Forms
  • Carbon Mitigation Credits
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Forms
  • Capacity
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Block Energy and Capacity Procurement
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Indexed Wind, Solar, and Brownfield
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Calendar
  • FAQs
  • Useful Links
  • Contact Us
    • Ask a Question
    • Register
    • Qualification Registration Form
  • Previous RFPs

Announcements

  • BEC RFP – ANNOUNCEMENT: Final Block Targets Posted March 31, 2023
  • Indexed REC RFP – ANNOUNCEMENT: Invitation to Comment on the Second Draft Indexed REC Contract and Draft Indexed REC RFP Rules March 30, 2023
  • BEC RFP – REMINDER: Part 1 Proposals due TODAY, March 27 by 12 PM (noon) CPT March 27, 2023


Announcements

March 13, 2018

BEC-9: When will instructions for the submission of the Bid Participation Fee be provided to bidders?

The instructions for submission of the Bid Participation Fee will be provided to bidders along with login credentials (March 14, 2018 for the Spring 2018 BEC RFP).

Post navigation

← It is my understanding that Appendix A has been added to the Form of Guaranty so that all outstanding Agreements with ComEd and all Guaranteed Obligations are consolidated under a single Guaranty. Can you provide more detail on the following sentence taken from the Form of Guaranty? “The maximum aggregate liability of the Guarantor found in Section 1 of this Guaranty shall be applicable to the Guaranteed Obligations under each of the Agreement(s) listed above.” When will the Spring 2018 Part 1 Form be made available to Bidders? →
  • Home
  • Announcements
  • Calendar
  • FAQs
  • Useful Links
  • Contact Us
  • Previous RFPs
  • Qualification Form

© 2020 Copyright Illinois Power Agency. All rights reserved.