Menu

Skip to content
  • Home
  • Announcements
  • Block Energy and Capacity Procurement
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Fall Block Energy and Capacity
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Brownfield
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Low-Income Community Solar Pilot
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Utility-Scale Wind
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Community Renewable Generation Program
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Forms
  • Carbon Mitigation Credits
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Forms
  • Indexed Wind, Solar, and Brownfield
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Coal to Solar
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Calendar
  • FAQs
  • Useful Links
  • Contact Us
    • Ask a Question
    • Register
    • Qualification Registration Form
  • Previous RFPs

Announcements

  • Supplemental RFP – ANNOUNCEMENT: ICC Has Approved the Results of the Supplemental Procurement Events for Block Energy May 20, 2022
  • Supplemental RFP – REMINDER: Bids Due Monday, May 16! May 13, 2022
  • Indexed REC RFP – ANNOUNCEMENT: ICC Has Approved the Results of the Spring 2022 Indexed REC RFP May 12, 2022


Announcements

March 2, 2016

SPV-142: Where are the webcast and recording posted?

The presentation and a recording of the webcast have been posted to the Supplemental PV Procurement Section of the procurement website. These files are posted under the heading “Supplemental PV Bidder Information Webcast” and are dated February 24, 2016.

Post navigation

← FAQ-SPV-91 states that “It would be acceptable if separate Bids are offered for two or more systems that are co-located on the same site and that will be associated with separate Revenue Quality Meters and each interconnected into a separate meter associated with separate utility accounts…” Can you please clarify the distinction that each separate meter must be associated with a separate utility account? Is anything changing substantially from the previous procurement events in regards to the bid submission process? →
  • Home
  • Announcements
  • Calendar
  • FAQs
  • Useful Links
  • Contact Us
  • Previous RFPs
  • Qualification Form

© 2020 Copyright Illinois Power Agency. All rights reserved.