Menu

Skip to content
  • Home
  • Announcements
  • Block Energy and Capacity Procurement
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Fall Block Energy and Capacity
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Brownfield
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Low-Income Community Solar Pilot
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Utility-Scale Wind
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Community Renewable Generation Program
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Forms
  • Calendar
  • FAQs
  • Useful Links
  • Contact Us
    • Ask a Question
    • Register
    • Qualification Registration Form
  • Previous RFPs
  • Qualification Form

Announcements

  • BEC RFP – ANNOUNCEMENT: ICC Has Approved the Results of the Spring 2021 Block Energy Procurement Events April 9, 2021
  • BEC RFP – REMINDER: Bids Due TOMORROW, Friday, April 9! April 8, 2021
  • BEC RFP – REMINDER: Bids Due Monday, April 5! April 2, 2021


Announcements

July 31, 2017

W&S-144: Where can I find the comments on the RFP?

The comments solicited as part of the IPA workshop on the Initial Forward Procurement are available at https://www.illinois.gov/sites/ipa/Pages/WorkshopComments.aspx.  The comments on standard contracts prepared by the Procurement Administrator are made available to the Commission but are not publicly posted. There was no comment process for other aspects of the RFP.

Post navigation

← Paragraph I.3.9. of the RFP Rules states that “If the ICC approves the results of the procurement event, each Seller with a Bid approved for a Project will execute the REC Contract with two (2) or more of the Companies within three (3) business days of the ICC decision.” Does this mean that the REC Contract has to be executed within three (3) business days with only two (2) of the three (3) utilities even if the RECs from our Project are allocated to all three (3) Companies? What would then be the deadline for execution of the REC Contract with the last Company? For a utility-scale wind project or a utility-scale solar project, is there flexibility for the Project’s actual capacity once it is built to be different from the capacity that was named in the Proposal, as long as 1) the Project’s nameplate capacity remains above 2 MW and 2) the annual quantity of RECs remains unchanged? →
  • Home
  • Announcements
  • Block Energy and Capacity
  • Utility-Scale Wind
  • Calendar
  • FAQs
  • Useful Links
  • Contact Us
  • Previous RFPs
  • Qualification Form

© 2020 Copyright Illinois Power Agency. All rights reserved.