Menu

Skip to content
  • Home
  • Announcements
  • Fall Block Energy and Capacity
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Brownfield
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Low-Income Community Solar Pilot
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Utility-Scale Wind
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Community Renewable Generation Program
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Forms
  • Carbon Mitigation Credits
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Forms
  • Capacity
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Block Energy and Capacity Procurement
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Indexed Wind, Solar, and Brownfield
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Calendar
  • FAQs
  • Useful Links
  • Contact Us
    • Ask a Question
    • Register
    • Qualification Registration Form
  • Previous RFPs

Announcements

  • BEC RFP – ANNOUNCEMENT: ICC Has Approved the Results of the Fall 2023 AIC Capacity Procurement Event September 21, 2023
  • Indexed REC RFP – REMINDER: Webcast Scheduled for Tuesday, October 3, 2023 at 3PM (CPT) September 19, 2023
  • BEC RFP – ANNOUNCEMENT: ICC Has Approved the Results of the Fall 2023 Block Energy Procurement Events September 14, 2023


Announcements

February 8, 2022

Indexed REC-9: Where can I find the posting of the stakeholder workshop materials from February 7, 2022 for the Indexed REC RFP?

The Procurement Administrator has posted the presentation materials and the audio recording from the stakeholder workshop held on February 7, 2022 to the Draft Documents page of the Indexed Wind, Solar, and Brownfield section of the website.

Post navigation

← Can a behind the meter project qualify as a brownfield site photovoltaic project in the Spring 2022 Indexed REC RFP? Is an interconnection agreement with a utility required? Slides 14 and 71 of the bidder information webcast from March 22, 2022 describe the bid evaluation for the Spring 2022 Indexed REC RFP as based on price only. On the other hand, Section 5.4.3 of the 2022 Long-Term Renewable Resources Procurement Plan (2022 Long-Term Plan) that was filed for Commission approval dated March 21, 2022 describes additional bid evaluation preferences applicable to competitive procurements for indexed renewable energy credits from utility-scale wind, utility-scale solar, and brownfield site photovoltaic sites. Will the bid evaluation preferences described in the filing (2022 Long-Term Plan) apply for purposes of bid evaluation in this Spring 2022 Indexed REC RFP? →
  • Home
  • Announcements
  • Calendar
  • FAQs
  • Useful Links
  • Contact Us
  • Previous RFPs
  • Qualification Form

© 2020 Copyright Illinois Power Agency. All rights reserved.