Announcements


LIP-9: Why is a Bidder required to demonstrate control for an area of at least three acres times the Project size in MW (AC rating)?

If the Interconnection Agreement for the Project is not fully executed, the Bidder must demonstrate control for an area of at least 3 acres times the Project size in MW (AC rating).  For example, if a Project is 10 MW then the Bidder must demonstrate control for 30 acres. This site control requirement is an alternative milestone to demonstrate project maturity.