Menu

Skip to content
  • Home
  • Announcements
  • Block Energy and Capacity Procurement
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Fall Block Energy and Capacity
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Brownfield
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Low-Income Community Solar Pilot
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Utility-Scale Wind
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Community Renewable Generation Program
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Forms
  • Carbon Mitigation Credits
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Forms
  • Indexed Wind, Solar, and Brownfield
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Coal to Solar
    • Results
    • Final Materials
    • Draft Documents
    • Qualification Form
  • Calendar
  • FAQs
  • Useful Links
  • Contact Us
    • Ask a Question
    • Register
    • Qualification Registration Form
  • Previous RFPs

Announcements

  • Indexed REC RFP – Illinois Power Agency Issues Request for Stakeholder Feedback on Spring 2022 Indexed REC Procurement July 1, 2022
  • BEC RFP – POSTING: Draft RFP Rules and Final Pre-Bid Letters of Credit for Fall 2022 July 1, 2022
  • ANNOUNCEMENT: Illinois Power Agency Issues Request for Stakeholder Feedback on Electricity and Capacity Procurement for Eligible Retail Customers June 27, 2022


Announcements

March 14, 2016

SPV-169: Will the Bidder Information Webcast materials be available after the webcast?

The slides, audio recording, as well as the questions and answers from the Bidder Information Webcast will all be posted to the Supplemental PV Procurement Section or the FAQ page of the procurement website.

Post navigation

← Is it possible to assign the SPV Contract from a winning system to another system? We have two systems, a 1 MW system and a 800 kW system. Both of these, for a variety of reasons, have the same expected production on a yearly basis. How is this handled in the SPV Contract? Is there a way to set the Maximum Contract Quantity on the basis of yearly production instead of the DC capacity rating? →
  • Home
  • Announcements
  • Calendar
  • FAQs
  • Useful Links
  • Contact Us
  • Previous RFPs
  • Qualification Form

© 2020 Copyright Illinois Power Agency. All rights reserved.